asdf
LEARN MORE
Grid Condition STABLE
In real-time, the switch from grid to microgrid takes ~250 milliseconds.
Select your grid condition
NEXT
Energy Control Center (ECC)
Grid Condition STABLE
adsf
Main Breaker
1
MasterPact MTZ-2
Multi-function Relay
2
ANSI25 (sync check), ANSI27 (undervoltage), ANSI32 (directional power), ANSI47 (phase sequence), and more
Surge Protection
3
Limits transient voltages by diverting or limiting surge current
SquareD I-Line Distribution Panel
4
Distribution section for feeder and DER breakers ≤1200A
Smart, Communicating Breakers
5
PowerPact and MasterPacT breakers with motor operators, advanced trip units, and more
Automation and Control Section
6
Houses most control components for essential functions such as islanding from the utility, load shedding, and forecasting
HMI (optional)
7
A simple touchscreen interface that an operator can use to interact with the ECC